ENGINEERING & SCIENCES

Our scientists, geologists, and engineers specialize in assessing and evaluating natural elements—soil, groundwater, and air—to develop practical, cost-effective solutions that prevent, minimize, or mitigate environmental degradation.

We ensure effective site management using advanced tools such as risk assessment, computer modeling, and statistical analysis.

We also provide guidance and expertise to support your team in navigating environmental challenges, fostering a strong commitment to compliance, and upholding environmental stewardship through effective plans and programs.

FEATURES:

For the past 15 years, CEI has been selected as an Environmental Consultant for Miami-Dade County (MDC) Regulatory and Economic Resources, Division of Environmental Resources Management (DERM), providing Environmental Cleanup, Compliance, and Related Services for various county departments. Recognized for our continued excellence, we have been chosen for yet another consecutive term, reinforcing our position as the #1 ranked firm.

Environmental Assessments

Environmental Impact Studies

Asbestos

Pollution Prevention & Control

Regulatory Compliance and Management

Natural resources

Civil engineering

Storm water design

Environmental training

Natural resources

Environmental Management Systems

Civil engineering

Storm water design

Environmental training

Natural resources

1
2
3
4
5
6
7
8

Division of Environmental Resources Management (DERM) Contract

CLIENT: Miami-Dade County (MDC) Regulatory and Economic Resources, Division of Environmental Resources Management (DERM)

TURNKEY SERVICES:

  • Environmental Cleanup, Compliance, and Related Services

CEI has successfully executed hundreds of petroleum and non-petroleum-related projects in compliance with Chapters 62-780 and 62-777 of the Florida Administrative Code and Chapter 24 of the Miami-Dade County Code. Our expertise spans all environmental assessment and remediation phases, including Site Assessments, Source (Soil) Removals, Free-Floating Product (FFP) Recovery, Remedial Action Plan Design, Remediation Plan Implementation, and Remedial System Operation and Maintenance. Additionally, we specialize in Engineering Control design and implementation, Restrictive Covenants, and ongoing Site Monitoring and Reporting, ensuring regulatory compliance and effective environmental management.

South Terminal Environmental Remediation & Post-Active Remediation Monitoring (PARM)

CLIENT: Broward County Aviation Department (BCAD)

TURNKEY SERVICES:

  • Contaminated Material Remediation
  • Post-Active Remediation Monitoring (PARM)
  • Reporting & Site Closure

The South Terminal (Terminal 4) site was historically used as a fuel storage facility, and underground storage tanks were removed in 1975. CEI participated in active site remediation that began in 2012 as a sub to HDR Engineering (HDR). The site was divided, and CEI completed remediation in three phases, each consisting of source removal of soil and free-floating product (FFP) and air sparging of the groundwater. In 2017, a Memorandum of Agreement (MOA) was executed and recorded between Broward County and the Florida Department of Environmental Protection, allowing for the site’s conditional closure due to remaining on-site contaminated soils and groundwater. Also in 2017, as a sub to Munilla Construction Management (MCM), CEI performed remediation of petroleum, arsenic, and asbestos-contaminated material from the Terminal 4 Apron area (approx. 7 acres) in an effort to remove all contaminated material to allow expansion of the Apron project. The remediation scope included excavating, stockpiling, testing, and disposing of approximately 21,000 tons of petroleum-contaminated soils off-site and pumping out 35,000 gallons of FFP. Subsequently, between 2018 and 2020 and under contract with BCAD, CEI performed PARM sampling and reporting activities, including installing replacement shallow and deep monitoring wells.

City of Miami, Supreme (Shamrock) Station Post Active Remediation Monitoring (PARM)

CLIENT: City of Miami

TURNKEY SERVICES:

  • Site Assessment & Limited Source Remedial Action Plan 
  • Source Removal & Remediation Activities 
  • Post-Active Remediation Monitoring (PARM)

Under contract with the City of Miami, CEI provided Post Active Remediation Monitoring (PARM) at the former Supreme (Shamrock) Station located at 6200 NW 17 Avenue in Miami, Florida, from 2017 to 2018. This site was a former gas station where free-floating product (FFP) and fuel-saturated soils were discovered in 1987 when eight underground storage tanks were removed. CEI became involved in the project when the City hired CEI in 2008 to complete a Site Assessment and in 2013 to complete a Limited Source Remedial Action Plan. In 2014, CEI completed source removal of 2,168 tons of petroleum-contaminated soil and 960 gallons of FFP and applied Klozur® CR in the open excavation with the use of an excavator. The source removal activities and associated post-removal groundwater sampling were documented in a Source Removal and Post Remedial Action Monitoring Report dated August 2017. CEI conducted PARM sampling and reporting activities during three quarters in 2018, which consisted of the sampling and analysis of up to 11 monitoring wells.

North Dade Landfill, Miami-Dade County Internal Services Department (ISD)

CLIENT: Miami-Dade County Internal Services Department (ISD)

TURNKEY SERVICES:

  • Environmental Site Assessment & Sampling
  • Regulatory Compliance & Reporting
  • Site Closure

CEI provided site assessment and closure activities for the Miami-Dade Internal Services Department at the North Dade Landfill between 2022 and 2023, resulting in no further action (NFA) and site closure. An assessment was completed by CEI, which included soil sampling and the installation of four shallow monitoring wells in the area of the aboveground storage tanks and dispensers for vehicular fueling. Analytical results from initial sampling, in addition to supplemental sampling, were combined with historical soil and groundwater data from previous assessments performed at the site. A summary of the assessment results was provided in a Site Assessment Report Addendum (SARA)/No Further Action Proposal. Miami-Dade Department of Environmental Resources Management approved the SAR pursuant to Chapter 62-780, F.A.C., and the FDEP issued a Site Rehabilitation Completion Order (SRCO) on June 20, 2023.

UST Removal & Environmental Assessment – Miccosukee Service Plaza

CLIENT: Miccosukee Tribe of Indians Florida

TURNKEY SERVICES:

  • Underground Storage Tank (UST) & Fuel System Removal
  • Sampling & Environmental Assessment
  • Groundwater Monitoring & Well Installation

Provided underground storage tank removal of one (1) 5,000-gallon and five (5) 10,000-gallon underground storage tanks (USTs), seventeen (17) fuel dispensers, and associated piping at the Miccosukee Service Plaza located at Exit #47 on Alligator Alley. Additionally, provided closure sampling consisting of soil screening using an organic vapor analyzer and collection of soil samples for laboratory analysis of soils from the tank, line, and dispenser excavations. Installed three (3) shallow monitoring wells in the former UST excavation and provided sampling of new wells and seven (7) existing monitoring wells.

FLL Rental Car Center Site Assessment & Source Removal

CLIENT: Broward County Aviation Department (BCAD)

TURNKEY SERVICES:

  • Site Assessment & Contamination Delineation
  • Regulatory Compliance & Reporting
  • Remediation & Source Removal

CEI performed site assessment, source removal, and cleanup services at the Consolidated Auto Rental Facility at Ft. Lauderdale-Hollywood International Airport (FLL). On February 7, 2016, an unleaded gasoline discharge was discovered which impacted the soil surrounding an underground fuel line. CEI was initially contracted to perform site assessment activities including soil sampling from an excavation dug by others to repair the fuel line and remove contaminated soil. Subsequently, CEI installed monitoring wells to determine the extent of the groundwater plume and performed weekly free product recovery from one of the wells where product was observed. CEI performed additional soil sampling and directed additional source removal of contaminated soil followed by natural attenuation monitoring. The field activities were documented in reports prepared by CEI including a Site Assessment Report, Source Removal Report, Natural Attenuation Monitoring (NAM) Plan, NAM reports and a Site Rehabilitation Completion Report and No Further Action Proposal. A Site Rehabilitation Completion Order (SRCO) was issued for the site on October 8, 2019.
CEI provided site assessment, source removal, and cleanup services at the Consolidated Auto Rental Facility at Ft. Lauderdale-Hollywood International Airport. On February 7, 2016, an unleaded gasoline discharge was discovered, impacting the soil surrounding an underground fuel line.
Initially, CEI was contracted to perform site assessment activities, including soil sampling from an excavation conducted by others for fuel line repairs and contaminated soil removal. CEI then installed monitoring wells to assess the extent of the groundwater plume and conducted weekly free product recovery from one of the wells where contamination was detected.
As the project progressed, CEI performed additional soil sampling and oversaw further source removal of contaminated soil, followed by natural attenuation monitoring to ensure site stabilization.

Devon Aire Park Source Removal, Miami, FL

CLIENT: Miami-Dade Parks, Recreation and Open Spaces

TURNKEY SERVICES:

  • Source Removal
  • Excavation
  • Source Removal Reporting

Soil source removals (SR) were conducted on 4 separate areas of arsenic contamination near a baseball diamond and open playing fields at Devon Aire Park. The source removal consisted of surveying the area to mark the locations of the excavations and to collect surface elevations, excavating the top 1 foot of soil from each of the four areas (estimated at 26,963 square feet; 1,848 square feet; 1,552 square feet and 3,482 square feet), resurveying the elevations to confirm 1-foot removal, placement of a high visibility non-woven geotextile liner over each excavation, followed by clean backfill material and sod. All work areas were secured with chain-link fencing and screens. A Source Removal Report submitted to DERM documents the source removal activities and includes supporting tables, figures, survey, manifests and clean-fill tickets. Project challenges included maintaining the park open and for use by the adjacent elementary school and working during the rainy season, which included numerous downpours and Hurricane Irma.

West Cargo Fuel Tender Facility Relocation – Miami International Airport (MIA)

CLIENT: Miami-Dade Aviation Department (MDAD)

TURNKEY SERVICES:

  • Dewatering & Groundwater Treatment
  • Fuel Facility Demolition & Soil Remediation

CEI was contracted by the Miami-Dade Aviation Department (MDAD) to relocate the existing West Cargo Fuel Tender Facility at Miami International Airport (MIA,) which allowed for the extension of Taxiway R to accommodate larger aircraft. CEI designed, implemented, and operated a complete dewatering system treating over 5 million gallons of hydrocarbon and vinyl chloride-contaminated groundwater as part of the environmental remediation scope of work. CEI applied for and obtained the dewatering permit and provided the required system sampling and reporting per the permit during the installation of the Hydrant Fuel System extension. Additionally, CEI demolished the former control building and excavated, removed, and hauled off-site over 8,000 tons of hydrocarbon-contaminated soils.