CEI assisted the Prime Contractor of this project with the excavation of soil, removal of subsurface utilities, and demolition of structures within the Slip Two expansion area at Port Everglades.

Read about it here.

 

The completion of an $18 million construction project lengthened Slip 2 by 225 feet.